For automotive OEMs

See your supply chain
the way you see
your own plants.

Supplier KPI Automation reads OEE, MTBF, MTTR and days on hand from each supplier's MES / ERP and delivers them to you live. When a number needs a reason, the same platform connects the supplier's critical cells in days — and tracks the molds you own at their sites. No spreadsheets. No hardware. Nothing the supplier has to build.

Visual Factories dashboard on an office PC with the production floor behind
Rolls-RoycePratt & WhitneyGühringDinexTecvoxTrinityRailTAV Medical
The problem

A ramp is only as fast as its least visible supplier.

You audit suppliers, score suppliers, visit suppliers. What you cannot do today is see a supplier's site running — until the parts are late. The KPIs you ask for arrive as hundreds of spreadsheets, weeks old, each computed its own way.

01

Five KPIs, hundreds of spreadsheets

Every supplier re-types OEE, MTBF, MTTR and days on hand from its MES / ERP into Excel. You consolidate, chase and question. By the time a number is read, it is weeks old.

02

300 ways to calculate one KPI

Every supplier computes OEE its own way. The numbers sit in one table but do not compare — ranking and trends are guesswork dressed as data.

03

The risk signal comes too late

Days on hand is the early warning for a line stop at your plant. Read monthly, it warns after the fact; a spreadsheet cell cannot be opened to see why.

Across a 300-supplier program, the manual method burns 300 to 600 person-days a month on numbers that are out of date before anyone reads them.
What you get

KPI automation first. Visibility when a number needs a reason.

Two layers on one platform. Start with the KPIs every supplier already owes you; go to the machine level only where the KPI says so.

Layer 1 · your lead product

Supplier KPI Automation

The supplier installs a read-only VF Client on its own server. The platform reads the agreed views of its MES / ERP and computes the five KPIs with one definition for every supplier, delivered live through the VF Dashboard, reports, alerts and the Unified View API.

  • OEE and finished-goods / raw-materials days on hand at site level
  • MTBF and MTTR per end-of-line, rolled up to the site
  • Secured: read-only, supplier-installed, outbound only, revocable by the supplier
  • A site is live about ten days after the supplier's approval; sites connect in parallel
Supplier KPI Automation the product page
Layer 2 · when the KPI needs a reason

Supply-chain visibility at machine level

Where a KPI flags a site — or where a supplier has no MES to read — the critical cells that make your parts connect in days through the electrical signals every machine already has. The supplier's electrician installs the device; no IT project on either side.

  • Live uptime, downtime and throughput of the nominated cells
  • The reason behind each loss, from the floor, not composed afterwards
  • The supplier runs the Floor-to-Profit Method on the same connection — you watch the constraint move
How a cell is connected
How to start

Ten sites, ten days each, in parallel.

Nominate the suppliers and obtain each one's approval for read-only access. Confirm the KPI definitions once, for everyone. A pilot wave of 10 to 20 sites is live in less than a month from the approvals — no development, no hardware, no site visit.

Day 0 · ApprovalDays 1–3 · ConnectDays 4–10 · ValidateDay 10+ · Live

Retire the spreadsheet.

A 30-minute briefing: your supplier list, your KPI definitions, and how fast a pilot wave of 10 to 20 sites goes live.

✓ Secured, read-only✓ Supplier-installed✓ No hardware, no site visit✓ ISO 27001
Scroll to Top

Schedule a Free Trial

Please fill in your details so we can get in touch and start your free trial.